MV Metal Enclosed Switchgear | Recycling

Category
Metal Enclosed Switchgear
About This Project

A local recycler was a challenging project that was delivered within 12 weeks of receiving the purchase order. A delay in breaker delivery required RIC Power to install a cable connection box in order to get up and running immediately. Three months later RIC Power installed the breaker on site during a scheduled shut down.

RATING

5kV, 2000A, 25kAIC

SWITCHING DEVICES

Eaton VCP-T